JFsys Supported the Trial Operation of Subway Line 4

News from Beijing MTR Corporation Limited says the trial operation without load of Subway Line 4 will be launched on Jun. 20, 2009, to make sure the whole system are ready for the trial operation. It is said that a test of stability and reliability of station equipments in simulated operation environment will be held during the trial operation without load. In the meantime, to test the execution of emergency preplan, another 111 on-the-spot drills in scenario simulations will be held.

As the software provider of MTR, JFsys has devoted a lot to assistance of the information system for Subway Line 4. In the operation center, sites of receiving end and monitoring center, engineers of JFsys are always ready to help. Facing the tight schedule and challenging task, JFsys has successfully fulfilled the assignment and contributed to the development of capital public transportation.

[Go Back to News Index]